Installation, Commissioning and Testing

Factory Acceptance Tests

tower install

Upon delivery, we execute Factory Acceptance Tests to ensure we deliver according your specification and requirements. Our tests will demonstrate that the system design and manufacturing meets all standards and requirements.

Verifying, inspecting, and testing of our equipment is performed prior to transportation to greatly reduce start-up time once the equipment arrives at your required destination.

Key specifications
  • Electrical test equipment
  • Hydraulic test equipment
  • Calibrated loadcells and loadlinks
Specifications
  • ABB Frequency Convertors up to 110 kW
  • Hydraulic power up to 320 bar / 670 l/min
  • Calibrated test weights up to 200t
  • Load measurements up to 100t
  • Siemens flight cases for PLC testing